On the Critical Path
On the Critical Path
Overview
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Similar
Uranium Drive-In (2013)
The Atom: A Love Affair (2019)
Radioactive: The Women of Three Mile Island (2024)
This Nuclear Age (1973)
Developing Tomorrow’s Energy (1980)
Wolsong: Vanishing Town (2019)
On Power Refuelling (1971)
Nuclear Power Reactor - Pickering (1973)
The Power of Matter (1960)
U 111 Dryout Experiment (1971)
Nuclear Fuel Waste Management (1979)
We Are the Guinea Pigs (1980)
The Red Princess (2022)
Sista varningen! (1980)
Decommissioning Fukushima: The Battle to Contain Radioactivity (2014)
The Battle of Chernobyl (2007)
Atomic: Living in Dread and Promise (2015)
Inside Chernobyl with Ben Fogle (2021)
The Nuclear Frontier (2025)
Decommissioning Fukushima 2024: Roadmap on the Brink (2024)












